Keyboard shortcuts

Press ← or → to navigate between chapters

Press S or / to search in the book

Press ? to show this help

Press Esc to hide this help

History

Plans and logs of finished work, kept for the record. They describe the state of the project when they were written.

Plans and logs in this folder

Campaign logs and decisions

Documentation restructure and release 0.7.1

Task logs of the campaign that merged the two guides into one, sorted docs/ by reader and made builder-built models faster: the merged guide, case study, fitting, R and Migrating, how-to page, landing page and README, reference pages, one checker for the guide, the engine change E1, the documentation after E1, the case study on the fast path and the review.

Lists by campaign

The functional M3–M10 work and ten performance iterations, with predeclared gates and retained failures under validation/campaign/. Up to release 0.7.0 this list was part of the README.

Campaign M3–M10 and performance iterations

Plans and decisions

Implementation logs and validation results