Bilevel energy-hub sizing with a pure-Rust inner LP

This tutorial sizes PV, wind, a battery, a tiered grid connection, and—in a separate chronological experiment—an electrolyser and hydrogen store. Each outer candidate creates a linear dispatch problem. microlp solves that inner problem to a proven optimum; fcmaes-core searches the discontinuous outer design space and owns candidate-level parallelism.

The distinction matters. Dispatch scheduling by itself is an LP and does not justify a global optimizer. The delivered sizing problem does because it adds catalogue tiers, inclusion switches, and a ratio objective around that LP. This is the counterpart to the other tutorials’ rule “use gradients when the model is smooth”: here the convex baseline is shown explicitly instead of being hidden.

The corrected checked-in publication protocol found:

  • a differential-evolution design with robust mean LCOE 0.045683 and minimum training self-sufficiency 92.53%;
  • 51 feasible nondominated MODE points spanning annualized CAPEX 266,567–1,187,577 and grid emissions 8.06–1,231.62 t CO₂/year;
  • an accepted D1 pilot on the archive’s actual 12 × 10 grid, followed by a 64-elite MAP-Elites portfolio; and
  • a chronological electricity/H₂ design whose independent hourly replay costs 0.051935 per combined delivered kWh, supplies all synthetic H₂ demand on site, and uses 2,119.55 kWh-H₂ of storage range.

These values come from synthetic profiles and a transparent teaching cost model. They demonstrate architecture and reproducibility, not an investable energy project.

Model boundary

The system is one industrial site behind one symmetric grid connection:

AssetOuter decisionMain representative-day modelAnnual extension
PV0–5,000 kWpyesyes
Windinclusion switch + 0–3,000 kWyesyes
Batteryswitch, 100–20,000 kWh, 50–5,000 kWyesyes
Gridone of 500, 850, 1,250, 1,800, 2,600, 4,000 kWyesyes
Electrolyserswitch + 0–2,500 kWexcludedyes
H₂ storeswitch + 0–120,000 kWh-H₂excludedyes

The ten optimizer coordinates are normalized to [0,1]. The authoritative decoder applies log scaling to battery sizes and equal-width bins to catalogue and boolean coordinates. MODE deliberately receives continuous normalized coordinates: declaring those coordinates integer would collapse them to only the endpoints before the decoder could reach every tier.

The shipped profiles are deterministic and synthetic. PV follows daylight and season; wind combines daily and slower harmonics; electrical and industrial H₂ demand have daily and seasonal terms; import prices use fixed time-of-use bands. The exact publication values are checked in as generated-publication.csv, while scenario-modifiers.csv defines every named perturbation.

No external data are needed. A reader substituting PVGIS or Open Power System Data must document the downloaded version, location, license, preprocessing, timezone, missing-data treatment, and resulting checksum. Such external data are not silently mixed into the checked-in results.

Inner dispatch LP

For timestep t of duration Δ, all dispatch variables are non-negative:

renewable[t] - curtail[t] + import[t] + discharge[t]
  = load[t] + export[t] + charge[t] + electrolyser[t] - unserved[t]

soc[t] = soc[t-1]
       + Δ (eta_charge charge[t] - discharge[t] / eta_discharge)

Import/export, charge/discharge, battery state, curtailment, and unserved load all have physical bounds. Representative-day battery state closes separately at every 24-hour boundary. The chronological model closes once across the whole year.

The annual extension adds:

h2[t] = h2[t-1]
      + Δ (eta_electrolyser electrolyser[t]
           + purchased_h2[t] - industrial_h2_demand[t])

Purchased H₂ is an always-available but expensive fallback. Without it, excluding the electrolyser would make a fixed-demand candidate infeasible; without any H₂ demand, a correct optimizer would size the store to zero.

The inner objective minimizes import cost minus export revenue, plus purchased H₂ and value of lost electrical load. Curtailment has exactly zero cost. Adding a positive tie-break cost to curtailment would break the strongest LP invariant—more installed capacity could then increase operating cost.

A 1e-9 currency/kWh tie-break is applied only to charge, discharge, and electrolyser flow. It selects a reproducible member of a degenerate optimum without changing the LP class: the coefficient is fixed, non-negative, and capacity expansion still enlarges the feasible set. Even if every bounded flow were simultaneously saturated, the annualized perturbation is at most 0.0876 currency/year in the publication representative-day model and 0.1095 currency/year in the chronological model. The actual perturbation is smaller. Curtailment remains unpenalized.

Unserved load and curtailment make every finite capacity vector LP-feasible. Outer infeasibility is therefore an explicit service residual, not NaN or a solver crash. A result is accepted only when microlp reports both Optimal and ProvenOptimal.

Solver gate and exact invariants

The implementation measured the pinned microlp 0.6.0 before adopting it:

HorizonLP variablesConstraintsLoaded-machine solveSimplex pivots
24 steps168480.34 ms110
288 steps2,01657622.6 ms1,519
2,016 steps14,1124,032322 ms10,080
8,760 steps61,32017,5202.60 s41,434

The machine was shared with another long optimization, so these are horizon diagnostics rather than isolated performance claims. The public API cannot replace arbitrary right-hand sides or capacity bounds after a solve; every candidate rebuilds its LP. It exposes pivot statistics but no public pure-LP iteration limit, so the tutorial uses no machine-dependent timeout. Full findings are in M1_FINDINGS.md.

Tests cover:

  • electrical and storage residuals, cyclic closure, and every physical bound;
  • an analytic two-hour arbitrage answer;
  • the all-zero design, which serves every kWh through the explicit slack;
  • capacity monotonicity over 200 nested capacity pairs;
  • no battery cycling with a flat tariff and unit efficiency;
  • coarse/hourly annual energy consistency;
  • all catalogue endpoints and a one-million-sample flat bin histogram; and
  • identical serial/parallel decoding of 10,000 candidates.

Why the outer problem is gradient-free

For a fixed architecture and continuous grid cost, the inner LP value plus linear annualized CAPEX is convex and piecewise linear in the capacities. The first landscape curve passes a scale-aware midpoint-convexity gate with no positive violation.

Three delivered features change the problem:

  1. LCOE divides cost by served energy;
  2. wind, battery, and hydrogen have inclusion switches; and
  3. the grid connection has catalogue steps.

The finite-difference experiment is stratified: half of its probes use random continuous interiors, while half sit immediately beside a tier or boolean boundary. The fine and coarse differences disagreed at all 50/50 registered boundary probes. A local derivative describes one piece, not the decision required to cross into another piece.

Horizons and permitted claims

PresetDispatch horizonState closureWhat it may establish
smokefour representative days, 96 hourly stepsonce per dayCI and intra-day battery dispatch
publicationtwelve representative days, 288 hourly stepsonce per dayrobust electricity-hub sizing
annual extension1,460 chronological six-hour steps, then one 8,760-hour replaywhole yearmodel-qualified H₂ storage behavior

The first two presets exclude the hydrogen subsystem in code. They cannot make a seasonal-storage claim, however attractive a representative-day number might look. Every manifest repeats this limitation.

Robust scenario protocol

Every scalar, MODE, and pilot candidate is evaluated on five training cases:

  • base_year;
  • low_solar_year;
  • high_load_winter;
  • tariff_peak_shifted; and
  • export_price_zero.

Selection is then challenged by structurally different holdouts: wind_outage, battery_derated_80pct, load_growth_15pct, and one quarter-hour replay. Holdouts change failure kind rather than only random seed. The quarter-hour case changes the discretization by four while retaining the LP balance invariants.

The selected robust dispatch shows how renewable power, grid exchange, and battery state interact across the twelve independently cyclic days:

Equal-budget scalar comparison

CMA-ES, differential evolution, and BiteOpt received 160 requested outer calls per arm and four seeded retries. Population-based methods can complete a generation beyond that request, so actual calls are reported rather than quietly truncated.

ArmActual outer callsRobust mean LCOEMin. self-sufficiencyMax. annual cyclesFeasible
Analytic seedbaseline replay0.07023675.39%426.52no
CMA-ES2480.05402697.21%277.92yes
DE2070.04568392.53%0.00yes
BiteOpt1600.05012088.19%0.00yes

The explicit analytic seed is infeasible and is not charged to any optimizer’s budget. All three optimized designs satisfy the frozen constraints. DE selected 1,447.60 kWp PV, 3,000 kW wind, no battery, and the 1,250 kW grid tier. Each retry derives its random stream from the arm root seed and stable retry ID, so changing worker count changes scheduling but not search trajectories.

One outer call expands into five LP solves. Across the three arms, 615 actual candidate calls caused 3,075 inner solves and 3,136,196 simplex pivots.

Full precision is in results/publication/so/.

Pre-registered descriptor gate

MAP-Elites is useful only when its axes are jointly reachable and sufficiently stable for selection. The primary pair was registered before running:

D1 = (daily battery throughput / installed battery kWh,
      peak import / installed grid capacity)

|Spearman correlation| < 0.7
clipping on either bound < 10%
coverage on the archive's native capacity-120 grid > 40%
same-niche battery-derating retention > 60%

The executable does not use a hand-drawn rectangular grid. It reproduces the exact regular-grid factorization used by fcmaes_core::Archive: publication capacity 120 is 12 columns × 10 rows, while smoke capacity 60 is a ragged seven-row grid with row lengths 9,9,9,9,8,8,8. A cross-check test compares the tutorial mapper against Archive::index_of_niche() over both layouts.

Daily normalization prevents the four- and twelve-day presets from changing the first descriptor merely by changing horizon length. Only feasible candidates enter the diagnostics.

D1 diagnosticMeasured
Structured candidates240
Feasible candidates95
Rank correlation0.1926
Bound clipping0.00% / 0.00%
Native-grid coverage45.83%
Minimum single-seed coverage20.00%
Battery-derating niche retention61.05%
Coarse 30-cell retention74.74%
Mean normalized D1 shift, hourly → 15-minute same day0.00793

D1 clears every frozen gate on the grid the archive actually uses. D2 = (self-sufficiency, curtailed-renewable fraction) has 84.21% retention but only 19.17% coverage; D3 includes the decision-led PV/battery ratio and remains a control rather than a fallback. The frozen publication verdict is therefore accepted, but only marginally: 58 of 95 candidates retain their niche, one retained candidate above the strict 60% threshold.

Minimum per-seed coverage was registered as a reported sensitivity diagnostic, not an acceptance threshold. It remains low at 20%. Adding a new gate after seeing that number would be as misleading as moving an existing threshold. The smoke preset is intentionally smaller and rejects D1 at 35.0% coverage and 57.1% retention; it exercises the skip path but does not replace the publication verdict.

D1’s first axis also has a structural boundary: 17 of the 95 feasible pilot designs are battery-free and therefore map to throughput zero. The selected scalar DE design is in this group, and battery derating cannot move such a design on that axis. This makes part of the retention result easier than for battery-using designs. The tutorial reports that limitation rather than post-hoc redefining the descriptor.

MAP-Elites portfolio

The accepted pilot authorized the frozen 256-call QD arm. It performed 1,280 LP solves, rejected 108 invalid or infeasible candidates, and occupied 64 of 120 niches (53.33%). Retained robust mean LCOE spans 0.047470–0.116068.

The archive replay is deliberately stricter than the pilot verdict: only 31 of 64 elites (48.44%) remain in the same niche after battery derating. The pilot gate answered whether D1 justified spending the QD budget; it did not guarantee that the optimized portfolio would have the pilot sample’s retention. The migration flags are therefore part of the deliverable, and a consumer needing stable post-derating selection should filter or re-optimize the portfolio.

Full precision is in results/publication/qd/, and the pilot verdict is results/publication/pilot/pilot.md.

Constrained MODE front

MODE independently minimizes:

  1. annualized CAPEX;
  2. worst annual unserved electrical energy;
  3. mean grid-import CO₂; and
  4. mean curtailed renewable energy.

Self-sufficiency, battery cycles, and LP status remain explicit constraints, all feasible at values no greater than zero. Tier and boolean coordinates remain continuous to MODE and are decoded only inside the objective.

The 384-call publication run retained 51 feasible nondominated points. Unserved energy is zero throughout the retained front, while CAPEX, CO₂, curtailment, and robust mean LCOE still trade off.

Full precision and selected extremes are in results/publication/mo/.

Chronological electricity and hydrogen extension

The annual arm is intentionally focused. BiteOpt sizes 32 candidates on 1,460 chronological six-hour periods. Only the selected design is rebuilt at hourly resolution and solved across all 8,760 periods.

The hourly replay selected:

Capacity or metricValue
PV4,323.25 kWp
Wind2,888.55 kW
Battery3,712.31 kWh / 663.00 kW
Electrolyser377.18 kW
H₂ store2,119.55 kWh-H₂
Grid2,600 kW
Combined delivered-energy cost0.051935
Electrical self-sufficiency99.41%
On-site H₂ fraction100.00%
H₂ storage amplitude2,119.55 kWh-H₂
Maximum storage residual1.61e-9 kWh

The six-hour sizing cost was 0.051207; the independent hourly value is 0.051935, so the coarse model is not reported as if it were the validation. The H₂ state has a nonzero year-linked pattern, but this synthetic one-year LP does not establish tank losses, degradation, compressor behavior, reserve requirements, or multi-year adequacy.

Budget accounting

Candidate count is not a sufficient work unit for an embedded solver:

ArmCandidate callsLP solvesSimplex pivotsLoaded-machine wall time
Landscape evidence501703779,3753.66 s
SO, three arms6153,0753,136,1965.04 s
MAP-Elites2561,280788,5223.61 s
MODE3841,9201,868,4363.05 s
Annual search + replay3237337,72419.92 s

The annual row separates 32 optimizer calls from four deterministic selection replays and the final hourly validation in its manifest. All values were recorded on a loaded machine.

Reproduce

From the public repository root:

cd tutorials/energy-hub-bilevel

# CI-sized complete protocol; its smaller pilot may record QD as skipped
cargo run --release --locked -- \
  --preset smoke --mode all --workers 2 --seed 42 --no-output

# Checked-in publication evidence
cargo run --release --locked -- \
  --preset publication --mode all --workers 4 --seed 42 \
  --output results/publication

# Regenerate the checked-in synthetic scenario table
cargo run --release --locked -- --mode scenarios --preset publication

# One arm with an explicit outer budget
cargo run --release --locked -- \
  --preset smoke --mode so --evaluations 100 --workers 4

workers = 0 resolves to available parallelism. Each microlp solve remains serial; candidate evaluation is the only parallel layer.

Native Rust writes schema-v1 JSON and full-precision CSV following ../RESULT_SCHEMA.md. Python only renders evidence:

python3 plot_results.py --write
python3 plot_results.py --check

results/smoke and results/local are ignored. Publication evidence and all SVGs are versioned.

Test and audit

cargo fmt --all -- --check
cargo clippy --all-targets -- -D warnings
cargo test
cargo doc --no-deps
cargo deny check licenses

fcmaes-core 0.1.3 is pinned, microlp 0.6.0 is pinned, the crate is a standalone workspace, and deny.toml audits the complete lockfile. The model is pure Rust and has no native LP dependency.

Limitations

  • Cost, weather, demand, and emissions factors are tutorial assumptions.
  • The inner model is linear and perfect-foresight; it omits unit commitment, demand charges, forecast error, network constraints, degradation, and reserve procurement.
  • Representative days model intra-day battery behavior only.
  • The annual H₂ model omits compression, leakage, minimum inventory, and conversion back to electricity.
  • Pilot acceptance means the registered sample justified running QD; the lower full-archive retention shows that it does not certify every elite.
  • Optimizer results are fixed-budget examples, not proofs of global optimality.