Bilevel energy-hub sizing with a pure-Rust inner LP
This tutorial sizes PV, wind, a battery, a tiered grid connection, and—in a
separate chronological experiment—an electrolyser and hydrogen store. Each
outer candidate creates a linear dispatch problem. microlp solves that inner
problem to a proven optimum; fcmaes-core searches the discontinuous outer
design space and owns candidate-level parallelism.
The distinction matters. Dispatch scheduling by itself is an LP and does not justify a global optimizer. The delivered sizing problem does because it adds catalogue tiers, inclusion switches, and a ratio objective around that LP. This is the counterpart to the other tutorials’ rule “use gradients when the model is smooth”: here the convex baseline is shown explicitly instead of being hidden.
The corrected checked-in publication protocol found:
- a differential-evolution design with robust mean LCOE
0.045683and minimum training self-sufficiency92.53%; - 51 feasible nondominated MODE points spanning annualized CAPEX
266,567–1,187,577and grid emissions8.06–1,231.62 t CO₂/year; - an accepted D1 pilot on the archive’s actual 12 × 10 grid, followed by a 64-elite MAP-Elites portfolio; and
- a chronological electricity/H₂ design whose independent hourly replay costs
0.051935per combined delivered kWh, supplies all synthetic H₂ demand on site, and uses2,119.55 kWh-H₂of storage range.
These values come from synthetic profiles and a transparent teaching cost model. They demonstrate architecture and reproducibility, not an investable energy project.
Model boundary
The system is one industrial site behind one symmetric grid connection:
| Asset | Outer decision | Main representative-day model | Annual extension |
|---|---|---|---|
| PV | 0–5,000 kWp | yes | yes |
| Wind | inclusion switch + 0–3,000 kW | yes | yes |
| Battery | switch, 100–20,000 kWh, 50–5,000 kW | yes | yes |
| Grid | one of 500, 850, 1,250, 1,800, 2,600, 4,000 kW | yes | yes |
| Electrolyser | switch + 0–2,500 kW | excluded | yes |
| H₂ store | switch + 0–120,000 kWh-H₂ | excluded | yes |
The ten optimizer coordinates are normalized to [0,1]. The authoritative
decoder applies log scaling to battery sizes and equal-width bins to catalogue
and boolean coordinates. MODE deliberately receives continuous normalized
coordinates: declaring those coordinates integer would collapse them to only
the endpoints before the decoder could reach every tier.
The shipped profiles are deterministic and synthetic. PV follows daylight and
season; wind combines daily and slower harmonics; electrical and industrial
H₂ demand have daily and seasonal terms; import prices use fixed time-of-use
bands. The exact publication values are checked in as
generated-publication.csv, while
scenario-modifiers.csv defines every
named perturbation.
No external data are needed. A reader substituting PVGIS or Open Power System Data must document the downloaded version, location, license, preprocessing, timezone, missing-data treatment, and resulting checksum. Such external data are not silently mixed into the checked-in results.
Inner dispatch LP
For timestep t of duration Δ, all dispatch variables are non-negative:
renewable[t] - curtail[t] + import[t] + discharge[t]
= load[t] + export[t] + charge[t] + electrolyser[t] - unserved[t]
soc[t] = soc[t-1]
+ Δ (eta_charge charge[t] - discharge[t] / eta_discharge)
Import/export, charge/discharge, battery state, curtailment, and unserved load all have physical bounds. Representative-day battery state closes separately at every 24-hour boundary. The chronological model closes once across the whole year.
The annual extension adds:
h2[t] = h2[t-1]
+ Δ (eta_electrolyser electrolyser[t]
+ purchased_h2[t] - industrial_h2_demand[t])
Purchased H₂ is an always-available but expensive fallback. Without it, excluding the electrolyser would make a fixed-demand candidate infeasible; without any H₂ demand, a correct optimizer would size the store to zero.
The inner objective minimizes import cost minus export revenue, plus purchased H₂ and value of lost electrical load. Curtailment has exactly zero cost. Adding a positive tie-break cost to curtailment would break the strongest LP invariant—more installed capacity could then increase operating cost.
A 1e-9 currency/kWh tie-break is applied only to charge, discharge, and
electrolyser flow. It selects a reproducible member of a degenerate optimum
without changing the LP class: the coefficient is fixed, non-negative, and
capacity expansion still enlarges the feasible set. Even if every bounded
flow were simultaneously saturated, the annualized perturbation is at most
0.0876 currency/year in the publication representative-day model and
0.1095 currency/year in the chronological model. The actual perturbation is
smaller. Curtailment remains unpenalized.
Unserved load and curtailment make every finite capacity vector LP-feasible.
Outer infeasibility is therefore an explicit service residual, not NaN or a
solver crash. A result is accepted only when microlp reports both Optimal
and ProvenOptimal.
Solver gate and exact invariants
The implementation measured the pinned microlp 0.6.0 before adopting it:
| Horizon | LP variables | Constraints | Loaded-machine solve | Simplex pivots |
|---|---|---|---|---|
| 24 steps | 168 | 48 | 0.34 ms | 110 |
| 288 steps | 2,016 | 576 | 22.6 ms | 1,519 |
| 2,016 steps | 14,112 | 4,032 | 322 ms | 10,080 |
| 8,760 steps | 61,320 | 17,520 | 2.60 s | 41,434 |
The machine was shared with another long optimization, so these are horizon
diagnostics rather than isolated performance claims. The public API cannot
replace arbitrary right-hand sides or capacity bounds after a solve; every
candidate rebuilds its LP. It exposes pivot statistics but no public
pure-LP iteration limit, so the tutorial uses no machine-dependent timeout.
Full findings are in M1_FINDINGS.md.
Tests cover:
- electrical and storage residuals, cyclic closure, and every physical bound;
- an analytic two-hour arbitrage answer;
- the all-zero design, which serves every kWh through the explicit slack;
- capacity monotonicity over 200 nested capacity pairs;
- no battery cycling with a flat tariff and unit efficiency;
- coarse/hourly annual energy consistency;
- all catalogue endpoints and a one-million-sample flat bin histogram; and
- identical serial/parallel decoding of 10,000 candidates.
Why the outer problem is gradient-free
For a fixed architecture and continuous grid cost, the inner LP value plus linear annualized CAPEX is convex and piecewise linear in the capacities. The first landscape curve passes a scale-aware midpoint-convexity gate with no positive violation.
Three delivered features change the problem:
- LCOE divides cost by served energy;
- wind, battery, and hydrogen have inclusion switches; and
- the grid connection has catalogue steps.
The finite-difference experiment is stratified: half of its probes use random
continuous interiors, while half sit immediately beside a tier or boolean
boundary. The fine and coarse differences disagreed at all 50/50 registered
boundary probes. A local derivative describes one piece, not the decision
required to cross into another piece.
Horizons and permitted claims
| Preset | Dispatch horizon | State closure | What it may establish |
|---|---|---|---|
smoke | four representative days, 96 hourly steps | once per day | CI and intra-day battery dispatch |
publication | twelve representative days, 288 hourly steps | once per day | robust electricity-hub sizing |
| annual extension | 1,460 chronological six-hour steps, then one 8,760-hour replay | whole year | model-qualified H₂ storage behavior |
The first two presets exclude the hydrogen subsystem in code. They cannot make a seasonal-storage claim, however attractive a representative-day number might look. Every manifest repeats this limitation.
Robust scenario protocol
Every scalar, MODE, and pilot candidate is evaluated on five training cases:
base_year;low_solar_year;high_load_winter;tariff_peak_shifted; andexport_price_zero.
Selection is then challenged by structurally different holdouts:
wind_outage, battery_derated_80pct, load_growth_15pct, and one
quarter-hour replay. Holdouts change failure kind rather than only random
seed. The quarter-hour case changes the discretization by four while retaining
the LP balance invariants.
The selected robust dispatch shows how renewable power, grid exchange, and battery state interact across the twelve independently cyclic days:
Equal-budget scalar comparison
CMA-ES, differential evolution, and BiteOpt received 160 requested outer calls per arm and four seeded retries. Population-based methods can complete a generation beyond that request, so actual calls are reported rather than quietly truncated.
| Arm | Actual outer calls | Robust mean LCOE | Min. self-sufficiency | Max. annual cycles | Feasible |
|---|---|---|---|---|---|
| Analytic seed | baseline replay | 0.070236 | 75.39% | 426.52 | no |
| CMA-ES | 248 | 0.054026 | 97.21% | 277.92 | yes |
| DE | 207 | 0.045683 | 92.53% | 0.00 | yes |
| BiteOpt | 160 | 0.050120 | 88.19% | 0.00 | yes |
The explicit analytic seed is infeasible and is not charged to any optimizer’s
budget. All three optimized designs satisfy the frozen constraints. DE selected
1,447.60 kWp PV, 3,000 kW wind, no battery, and the 1,250 kW grid tier.
Each retry derives its random stream from the arm root seed and stable retry
ID, so changing worker count changes scheduling but not search trajectories.
One outer call expands into five LP solves. Across the three arms, 615 actual candidate calls caused 3,075 inner solves and 3,136,196 simplex pivots.
Full precision is in
results/publication/so/.
Pre-registered descriptor gate
MAP-Elites is useful only when its axes are jointly reachable and sufficiently stable for selection. The primary pair was registered before running:
D1 = (daily battery throughput / installed battery kWh,
peak import / installed grid capacity)
|Spearman correlation| < 0.7
clipping on either bound < 10%
coverage on the archive's native capacity-120 grid > 40%
same-niche battery-derating retention > 60%
The executable does not use a hand-drawn rectangular grid. It reproduces the
exact regular-grid factorization used by fcmaes_core::Archive: publication
capacity 120 is 12 columns × 10 rows, while smoke capacity 60 is a ragged
seven-row grid with row lengths 9,9,9,9,8,8,8. A cross-check test compares
the tutorial mapper against Archive::index_of_niche() over both layouts.
Daily normalization prevents the four- and twelve-day presets from changing the first descriptor merely by changing horizon length. Only feasible candidates enter the diagnostics.
| D1 diagnostic | Measured |
|---|---|
| Structured candidates | 240 |
| Feasible candidates | 95 |
| Rank correlation | 0.1926 |
| Bound clipping | 0.00% / 0.00% |
| Native-grid coverage | 45.83% |
| Minimum single-seed coverage | 20.00% |
| Battery-derating niche retention | 61.05% |
| Coarse 30-cell retention | 74.74% |
| Mean normalized D1 shift, hourly → 15-minute same day | 0.00793 |
D1 clears every frozen gate on the grid the archive actually uses. D2 =
(self-sufficiency, curtailed-renewable fraction) has 84.21% retention but
only 19.17% coverage; D3 includes the decision-led PV/battery ratio and remains
a control rather than a fallback. The frozen publication verdict is therefore
accepted, but only marginally: 58 of 95 candidates retain their niche, one
retained candidate above the strict 60% threshold.
Minimum per-seed coverage was registered as a reported sensitivity diagnostic, not an acceptance threshold. It remains low at 20%. Adding a new gate after seeing that number would be as misleading as moving an existing threshold. The smoke preset is intentionally smaller and rejects D1 at 35.0% coverage and 57.1% retention; it exercises the skip path but does not replace the publication verdict.
D1’s first axis also has a structural boundary: 17 of the 95 feasible pilot designs are battery-free and therefore map to throughput zero. The selected scalar DE design is in this group, and battery derating cannot move such a design on that axis. This makes part of the retention result easier than for battery-using designs. The tutorial reports that limitation rather than post-hoc redefining the descriptor.
MAP-Elites portfolio
The accepted pilot authorized the frozen 256-call QD arm. It performed 1,280
LP solves, rejected 108 invalid or infeasible candidates, and occupied 64 of
120 niches (53.33%). Retained robust mean LCOE spans
0.047470–0.116068.
The archive replay is deliberately stricter than the pilot verdict: only 31
of 64 elites (48.44%) remain in the same niche after battery derating. The
pilot gate answered whether D1 justified spending the QD budget; it did not
guarantee that the optimized portfolio would have the pilot sample’s
retention. The migration flags are therefore part of the deliverable, and a
consumer needing stable post-derating selection should filter or re-optimize
the portfolio.
Full precision is in
results/publication/qd/,
and the pilot verdict is
results/publication/pilot/pilot.md.
Constrained MODE front
MODE independently minimizes:
- annualized CAPEX;
- worst annual unserved electrical energy;
- mean grid-import CO₂; and
- mean curtailed renewable energy.
Self-sufficiency, battery cycles, and LP status remain explicit constraints, all feasible at values no greater than zero. Tier and boolean coordinates remain continuous to MODE and are decoded only inside the objective.
The 384-call publication run retained 51 feasible nondominated points. Unserved energy is zero throughout the retained front, while CAPEX, CO₂, curtailment, and robust mean LCOE still trade off.
Full precision and selected extremes are in
results/publication/mo/.
Chronological electricity and hydrogen extension
The annual arm is intentionally focused. BiteOpt sizes 32 candidates on 1,460 chronological six-hour periods. Only the selected design is rebuilt at hourly resolution and solved across all 8,760 periods.
The hourly replay selected:
| Capacity or metric | Value |
|---|---|
| PV | 4,323.25 kWp |
| Wind | 2,888.55 kW |
| Battery | 3,712.31 kWh / 663.00 kW |
| Electrolyser | 377.18 kW |
| H₂ store | 2,119.55 kWh-H₂ |
| Grid | 2,600 kW |
| Combined delivered-energy cost | 0.051935 |
| Electrical self-sufficiency | 99.41% |
| On-site H₂ fraction | 100.00% |
| H₂ storage amplitude | 2,119.55 kWh-H₂ |
| Maximum storage residual | 1.61e-9 kWh |
The six-hour sizing cost was 0.051207; the independent hourly value is
0.051935, so the coarse model is not reported as if it were the validation.
The H₂ state has a nonzero year-linked pattern, but this synthetic one-year LP
does not establish tank losses, degradation, compressor behavior, reserve
requirements, or multi-year adequacy.
Budget accounting
Candidate count is not a sufficient work unit for an embedded solver:
| Arm | Candidate calls | LP solves | Simplex pivots | Loaded-machine wall time |
|---|---|---|---|---|
| Landscape evidence | 501 | 703 | 779,375 | 3.66 s |
| SO, three arms | 615 | 3,075 | 3,136,196 | 5.04 s |
| MAP-Elites | 256 | 1,280 | 788,522 | 3.61 s |
| MODE | 384 | 1,920 | 1,868,436 | 3.05 s |
| Annual search + replay | 32 | 37 | 337,724 | 19.92 s |
The annual row separates 32 optimizer calls from four deterministic selection replays and the final hourly validation in its manifest. All values were recorded on a loaded machine.
Reproduce
From the public repository root:
cd tutorials/energy-hub-bilevel
# CI-sized complete protocol; its smaller pilot may record QD as skipped
cargo run --release --locked -- \
--preset smoke --mode all --workers 2 --seed 42 --no-output
# Checked-in publication evidence
cargo run --release --locked -- \
--preset publication --mode all --workers 4 --seed 42 \
--output results/publication
# Regenerate the checked-in synthetic scenario table
cargo run --release --locked -- --mode scenarios --preset publication
# One arm with an explicit outer budget
cargo run --release --locked -- \
--preset smoke --mode so --evaluations 100 --workers 4
workers = 0 resolves to available parallelism. Each microlp solve remains
serial; candidate evaluation is the only parallel layer.
Native Rust writes schema-v1 JSON and full-precision CSV following
../RESULT_SCHEMA.md. Python only renders evidence:
python3 plot_results.py --write
python3 plot_results.py --check
results/smoke and results/local are ignored. Publication evidence and all
SVGs are versioned.
Test and audit
cargo fmt --all -- --check
cargo clippy --all-targets -- -D warnings
cargo test
cargo doc --no-deps
cargo deny check licenses
fcmaes-core 0.1.3 is pinned, microlp 0.6.0 is pinned, the crate is a
standalone workspace, and deny.toml audits the complete lockfile.
The model is pure Rust and has no native LP dependency.
Limitations
- Cost, weather, demand, and emissions factors are tutorial assumptions.
- The inner model is linear and perfect-foresight; it omits unit commitment, demand charges, forecast error, network constraints, degradation, and reserve procurement.
- Representative days model intra-day battery behavior only.
- The annual H₂ model omits compression, leakage, minimum inventory, and conversion back to electricity.
- Pilot acceptance means the registered sample justified running QD; the lower full-archive retention shows that it does not certify every elite.